Skip to content
Inligo Networks

Inligo Networks

Enhancing digital connectivity across Asia Pacific

  • Home
  • About Us
    • Our Vision
    • Our Network
    • Our Locations
    • Global Advisory Board
    • Privacy Policy
  • Our Projects
    • Asia Connect Cable System (ACC-1)
    • Unite Cable System
    • Darwin Cable Landing Station
      • What is an Open Cable Landing Station?
    • Subsea Optical Fibre Cable Benefits
  • News
  • Contact Inligo Networks

Month: June 2022

  • Home
  • 2022
  • June
Sacom and Inligo Networks conclude meetings with Timor Leste President Ramos-Horta
Posted by: Duncan Buchanan Posted on June 24, 2022April 4, 2023

Sacom and Inligo Networks conclude meetings with Timor Leste President Ramos-Horta

The owner of Sacom Timor-Leste company, Abílio Araújo, has committed to bringing a subsea fibre optic cable from Singapore to Timor-Leste. After meeting with President…

Copyright © 2025 Inligo Networks All Rights Reserved | Businesszen by Theme Palace